The finalised ESEM contracts are here – What do they look like and what is left to be done?
The Electricity Contract Co-Design Working Group has released the finalised terms for the three ESEM products (bulk energy, shaping and firming) and published its final report.
We look at what has changed from the drafts, the significant issues deferred to the next phase, and what this means for developers, financiers and offtakers.
The Electricity Contract Co-Design Working Group (Working Group) has released its final report on the proposed Electricity Services Entry Mechanism (ESEM) contracts (WG Report) (ESEM contract final report) and has separately published the recommended contract (ESEM recommended contract structures).
We published a paper on the draft ESEM Contracts when they were released (What the ESEM contracts could look like – have your say).
The key observations on the updated ESEM Contracts are the:
(we highlight the key changes below)
This product is based on a swap structure. It works by fixing the price received by the Seller per MWh of output, where the notional quantity for a trading interval is determined by multiplying the Contract Capacity by the Regional Reference Index (RRI).
The RRI is to be set by reference to the performance of the Regional Reference Fleet (RRF), which contains all operational projects of the specified technology within the specified NEM Region with a Nameplate Capacity of 30MW or greater.
The RRI is calculated, for each trading interval, as the sum for all projects in the RRF of:
A significant change from the draft RRPPA is the inclusion of a scaling factor. Each project within the RRF is scaled so that its contribution to the RRI is capped. This seeks to limit index inter-year variability and skewing of the RRI by one particular project, particularly in regions with smaller reference fleets. The cap will be determined by the ESEM Administrator, but the Working Group considers 10% as a reasonable starting position noting this could vary for different states and technologies.
The Working Group has stated several aspects of the RRI design require further development including the calculation methodology (determining the cap and how curtailments are managed); the RRF composition (how to deal with new projects and retirements); and how to include hybrid projects in the RRF.
A key issue with this product continues to be the composition of the RRF, and how the RRF is managed for new generation and retirements over the life of the ESEM Contract. The Working Group has acknowledged this is an area that requires review before implementation.
The challenge for the RRPPA is whether the Seller can "beat" the RRI and do so for the life of the RRPPA. That risk may increase as the composition of the RRF changes, as curtailment and network constraints change regionally, and as marginal loss factors move. Developers and financiers will want to model this carefully as this will affect the bankability of the project.
The Working Group has resolved the settlement of the RRPPA for negative and high spot prices. The RRPPA is to include a $0/MWh floor and a $600/MWh cap on the floating price.
This means Sellers will:
The Working Group suggested that:
The Working Group has noted that this position requires further consideration during long-form drafting process.
This is an issue that has been deferred.
Green products (such as LGCs and REGOs) will be excluded from the ESEM products, so sponsors will need to manage any certificate contracting separately.
All at the Seller's risk – see comments below.
The DDBS swap uses an ex-ante, dynamic approach to defining the forecast optimal periods for discharge and charge ahead of time. It will use an arithmetic formula to determine the trading intervals to be included in the Discharge and Charge Periods.
The DDBS swap is expected to accommodate shaping durations of around 2-8 hours with the ESEM Administrator setting the duration(s) for a particular tender (and potentially procuring different durations in the same round).
The product is settled by comparing the actual spread against an agreed fixed spread for a day calculated ex-post where:
Under the draft ESEM legislation, the DDBS swap could be awarded to any dispatchable technology.
The draft DDBS swap left a lot of detail to be finalised as to the method for determining the Discharge and Charge Periods.
This has been clarified, to an extent. The Working Group has proposed that the ESEM Administrator will determine Charge and Discharge Periods based on forecast residual demand (using yet to be specified AEMO data) for a trading interval, where:
𝑅𝑒𝑠𝑖𝑑𝑢𝑎𝑙 𝐷𝑒𝑚𝑎𝑛𝑑𝑇𝐼 = 𝑂𝑝𝑒𝑟𝑎𝑡𝑖𝑜𝑛𝑎𝑙 𝐷𝑒𝑚𝑎𝑛𝑑𝑇𝐼 − (𝐹𝑜𝑟𝑒𝑐𝑎𝑠𝑡 𝑆𝑜𝑙𝑎𝑟 𝑃𝑉 𝑂𝑢𝑡𝑝𝑢𝑡𝑇𝐼 + 𝐹𝑜𝑟𝑒𝑐𝑎𝑠𝑡 𝑊𝑖𝑛𝑑 𝑂𝑢𝑡𝑝𝑢𝑡𝑇𝐼)
The ESEM Administrator will publish nominated Charge and Discharge Periods at 13:00 each day for the following Daily Shaping Period.
It is intended that:
Resolution of this issue has been partly deferred - the datasets used to forecast residual demand, and the parties and platforms responsible for calculating and publishing nominations, are still to be defined.
Charge and Discharge Periods will be published at 13:00 for a Daily Shaping Period starting at 16:05, giving Sellers around three hours' notice, and physical plant is expected to be able to defend the position. But as the market moves over the course of the day, will these periods match the most economic time to charge or discharge?
There are significant changes in NEM pricing and trading over the course of a day, which are likely to result in significantly different outcomes from those predicted. This is likely to lead to some interesting trading outcomes. We expect that longer shaping durations of up to eight hours will also carry greater forecast error.
These issues have not been addressed in the WG Report.
All at the Seller's risk – see comments below.
This operates as a conventional cap, and the structure is well known in the market. The Working Group has set it as a $600/MWh strike price.
This is a relatively uncontroversial product. Under the draft ESEM legislation, the Cap Contract could be awarded to any dispatchable technology.
All at the Seller's risk – see comments below. However, this is a typical feature of a cap contract. Buyers have raised concerns that exposure between $300/MWh and $600/MWh is left unmanaged; the Working Group expects buyers wanting that protection will continue to purchase conventional $300/MWh caps.
The WG Report notes that:
The Department of Climate Change, Energy, the Environment and Water has proposed a solution based on the Capacity Investment Scheme processes. It suggested an entity that could enter into bilateral force majeure protections for individual projects, as a separate but complementary scheme to the ESEM. Force majeure provisions would need to be appropriately defined within a bilateral contract between the Seller and such an entity to render such contracts bankable.
The WG Report gives no more detail, and we will need to wait until, at least, the finalised ESEM legislation package is published.
This is an issue that has been deferred and is a critical one for bankability.
We know in the non-renewable generation market, force majeure risk can be managed by things such as:
These are not products or outcomes typically seen for single assets or participants in the renewable energy or energy storage sectors.
So, it is still unclear how force majeure risk will be managed.
Beyond force majeure, the ESEM Contracts leave marginal loss factor, change in law and network constraint risk with the Seller, and, for the DDBS swap, storage degradation and round-trip efficiency risk remain with the Seller, These risks are outside the Seller's control (or, for storage performance, degrade over the life of the asset) and will need to be reflected in pricing and managed by Sellers through other mitigants such as conservative bidding and uncontracted merchant headroom.
Bankability of these contracts is a key issue and was recognised by the Working Group. It is clear that the Working Group undertook detailed studies especially in respect of the RRPPA.
We still think significant road testing of the contracts, and even trial financing, might be required to help these contracts become accepted by the finance market.
The Working Group noted the proposed contracts are intended to support ESEM Contract recycling. It flagged that further work is required to design trading and auction arrangements to ensure the proposed contracts can support this purpose, noting it is outside its terms of reference.
The Working Group noted that new projects are struggling to secure offtake even in their early years, not just the longer-term tenor gap. Stakeholders suggested auction designers may need to shorten (or waive) the in-market period and consider long-dated tenors (e.g. 20 years), which would reposition the ESEM from a tenor support mechanism towards a more substantive funding mechanism.
The Working Group stated that these perspectives will need to be explored further.
In Phase 2, the Convening Group will engage legal support to develop long-form contract templates (for example, a confirmation under the 2002 ISDA Master Agreement), expected to take approximately four months. The Working Group is expected to provide a recommendation on the draft long-form contracts ahead of the mid-2027 ECMC meeting, with the first ESEM tender anticipated in late 2027.
Authors: Dale Gill, Partner; Aylin Cunsolo, Partner; Paul Newman, Consultant; Isabelle Jardine, Graduate and Vanessa Robinson, Graduate.
The information provided is not intended to be a comprehensive review of all developments in the law and practice, or to cover all aspects of those referred to.
Readers should take legal advice before applying it to specific issues or transactions.