    Context of the reform: what is in force and since when

    During 2026, the Spanish Government has approved several royal decree-laws relating to housing. This type of legislation applies from the moment it comes into force, but is repealed if Parliament does not ratify it.

    This was the case in the first four months of the year with Royal Decree-Law 8/2026 of 20 March on the extension of lease agreements and limits on rent increases (RDL 8/2026), which was repealed on 28 April 2026.

    The same subsequently happened with Royal Decree-Laws 26/2026 and 27/2026, both dated 29 September (RDL 26/2026 and RDL 27/2026). They were repealed on 2 October 2026, having been in force for only two days and a few hours, respectively.

    Following that vote, on 5 October the Government held an extraordinary Council of Ministers meeting at which it agreed to dissolve Parliament and call a general election. The following day, it approved two new Royal Decree-Laws which, with some amendments, incorporate the content of the repealed decrees: Royal Decree-Law 29/2026, which replaces RDL 26/2026, and Royal Decree-Law 28/2026, which replaces RDL 27/2026.

    This note focuses on Royal Decree-Law 29/2026 of 6 October (Spanish text only), adopting urgent measures to protect the social function of housing and expand the supply of affordable housing (RDL 29/2026). This legislation has been in force since 8 October 2026, the day following its publication. The Standing Committee of the Congress (Diputación Permanente del Congreso de los Diputados), the body with authority while Parliament is dissolved, ratified it on 12 November 2026. Some of its tax measures, however, will come into force later: those relating to VAT, for example, will apply from 1 December 2026.

    Royal Decree-Law 28/2026 of 6 October, adopting urgent measures to strengthen the stability of lease agreements for the principal residence, fared differently. The Government approved it together with RDL 29/2026, but the Standing Committee refused to ratify it at the same sitting at which it ratified RDL 29/2026. The decree was repealed before it was due to come into force on 15 November 2026, so it never applied and we do not analyse it in this note.

    Main measures introduced by Royal Decree-Law 29/2026

    1. Restrictions on speculative activity in the housing market

    Article 1 of RDL 29/2026 temporarily restricts certain acquisitions of residential units, whether free of charge or for consideration below market value.

    Q. What exactly does the restriction entail (Article 1.1 of RDL 29/2026)?

    A. Until 31 December 2030, certain entities may not acquire residential units (i) free of charge or (ii) for consideration below 70 per cent of their market value.

    In other words, the transaction can only go ahead if the price paid is at least 70 per cent of that value.

    RDL 29/2026 does not say whether the 70 per cent threshold applies unit by unit or to the transaction as a whole, or how to apportion an aggregate price. As the legislation refers to the acquisition of "a residential unit",’ the safer course is to test each unit separately.

    Q. Which assets are affected?

    A. The restriction applies to residential units in use and to residential units in buildings constructed on land zoned for residential use that meet the requirements for a certificate of habitability (cédula de habitabilidad) once they have a certificate of completion of works. It therefore also covers newly completed developments, even if they have not yet been occupied. It does not cover land, or residential units under construction that lack a certificate of completion of works.

    We read the reference to the certificate of habitability as covering whichever authorisation each autonomous community requires (cédula de habitabilidad, first occupation licence or responsible declaration of first occupation, etc.).

    What happens if, instead of the residential units themselves, shares or holdings in the owner companies are acquired? Article 1 does not mention the purchase of shares or holdings. Nevertheless, given the purpose of the regulation, the possibility of a broad interpretation cannot be ruled out.

    The restriction applies only to the acquisition of residential units. The purchase of mortgage loans is not affected. However, investors in loan portfolios who are affected entities are, at least for the time being, restricted from acquiring or being awarded residential units at auction or through mortgage foreclosure below the 70 per cent threshold (see the question below: "Does this affect acquisitions arising from judicial enforcement or mortgage foreclosure proceedings (Article 1.4 of RDL 29/2026)?").

    Q. Which entities are affected?

    A. The following are affected:

    (a) Entities, whether or not they have legal personality, engaged in the acquisition of properties or portfolios of defaulted mortgage loans at a price significantly below their market valuation.

    We understand that the requirement for a price that is "significantly below" applies to both properties and portfolios.

    However, what does it mean for an entity to be "engaged" in buying at a discount? Must this activity be included in its corporate purpose? Does it have to be its main activity?

    (b) Legal persons that qualify as large holders under state housing legislation. These are owners of more than ten urban properties for residential use or more than 1,500 m² of built area for residential use, excluding garages and storage rooms. Each residential unit in a building counts as a separate property, even without a registered horizontal division.

    In our view, for these legal entities to be affected, it is not necessary for them to be engaged in the property business or to habitually purchase properties at a discount.

    Further doubts arise as to whether owners of five or more properties in stressed residential market areas should be considered large holders. This threshold does not stem from regional legislation. It is provided for in Article 3(k) of Law 12/2023 on Housing, which is state legislation, although its application depends on the autonomous community activating it on justified grounds when declaring the stressed residential market area. There are, therefore, arguments for interpreting the reference to "state legislation" as also encompassing this reduced threshold in areas where it has been activated.

    (c) Entities within the same group or acting on their behalf.

    On a literal reading, Article 1 places the reference to the group immediately after large holders ("as well as legal persons that qualify as large holders […] or entities forming part of the same group or acting on their behalf"). This suggests that it covers only entities in the group of a large holder, not those in the group of an entity engaged in discounted purchases. However, the legislator clearly seems to have intended to cover both.

    The purchase of properties at a discount by natural persons is not restricted by Article 1.

    Q. How is the market value determined, and what is meant by "consideration"?

    A. The market value is determined as at the date of the binding agreement by an accredited valuation firm, registered with the Bank of Spain and independent of the parties. The buyer must provide the valuation report.

    We consider that the buyer who provides the valuation report also bears its cost.

    The value is fixed as at the date of the "binding agreement". The legislation does not define this concept; nor does it specify how long the valuation remains valid or what happens if the value changes before the deed of sale is executed.

    Article 1.1 of RDL 29/2026 sets out the rules for determining the total effective consideration. This is understood to mean the sum of all amounts, debts assumed, ancillary obligations and financial advantages paid or committed to by the purchaser, or by persons related to them, as a direct or indirect consequence of the transfer.

    Q. Are there any exceptions (Article 1.2 of RDL 29/2026)?

    A. Yes. The restriction does not apply to acquisitions:

    (a) intended for use as a principal residence at an affordable or social price until at least 31 December 2030;

    Article 9 of RDL 29/2026, which amends Law 11/2009 regulating Spanish REITs (SOCIMIs), defines "properties intended for rental at an affordable price" for the purposes of the special SOCIMI regime under Corporate Income Tax. Under this article, these are properties classified as affordable housing and properties classified as protected housing under Article 3 of Law 12/2023 on Housing, whether as social housing or as limited-price housing. In turn, Article 14 of RDL 29/2026 defines "affordable housing" as housing whose sale price or rent, including associated costs, does not exceed 30 per cent of the median income of the usual household in the municipality where it is located.

    It is not clear whether the definition in Article 9 of RDL 29/2026 applies for the purposes of Article 1.2. If it did, the reference to "social" housing would be redundant, as the definition of affordable housing would already cover it. In any event, it would remain unclear whether the exception requires this stricter 30 per cent threshold or whether falling within the categories in Law 12/2023 on Housing (incentivised affordable housing, social housing, and limited-price housing) is sufficient.

    (b) for use as social and healthcare residences;

    (c) for use as accommodation for people belonging to socially vulnerable groups, acquired by third-sector social action entities;

    (d) for the protection of victims of gender-based violence, whether for care or residential purposes, in any form; or

    (e) where the purchaser provides evidence of adherence to and compliance with the Code of Good Practice, which is still pending approval by a Council of Ministers resolution (the Code). This condition is deemed to be met by territorial public authorities, public bodies, and public-sector companies whose purpose is the permanent development and management of social and affordable housing.

    Q. Does this affect acquisitions arising from judicial enforcement and mortgage foreclosure proceedings (Article 1.4 of RDL 29/2026)?

    A. For the time being, yes.

    Article 1.4 of RDL 29/2026 provides that the restriction does not apply to acquisitions of property arising from enforcement proceedings brought before the courts or from mortgage foreclosure proceedings.

    However, it requires the entity initiating the enforcement proceedings to demonstrate adherence to and compliance with the Code referred to in the previous question. Therefore, until the Code is approved and comes into force, affected entities will not be able to be awarded residential units in enforcement proceedings for less than 70 per cent of their market value. Once the Code has been approved, they will have to adhere to it and comply with its provisions if they wish to rely on the exemption, which would allow them to be awarded the residential unit for less than 70 per cent of its market value.

    When the exception starts to apply, questions will arise regarding its objective scope (for example, whether it covers transfers in lieu of payment (daciones en pago)) and its subjective scope (for example, what happens if the party initiating the enforcement proceedings is not the same as the party awarded the residential unit).

    Q. Do any special rules apply to institutions acquiring properties at a discount under the Code or under the exemption applicable to awards arising from judicial or mortgage enforcement proceedings (Article 1.5 of RDL 29/2026)?

    A. Yes. Where an affected entity invokes its adherence to the Code to acquire or be awarded an asset at a discount that constitutes the main residence of a vulnerable person with no alternative accommodation, any eviction affecting that property shall be suspended until 31 December 2030.

    The suspension applies both to purchases (Article 1.1 of RDL 29/2026) and to awards in enforcement proceedings (Article 1.4 of RDL 29/2026) and overlaps in part with the eviction suspensions set out in Article 2, which we will analyse in the following section (Suspension of evictions until 31 December 2030 and new obligation on the public authorities to cure arrears).

    In the context of property awards, Article 1.5 of RDL 29/2026 protects vulnerable occupants from eviction by the debtor when the successful bidder requests possession of the property as part of the mortgage enforcement proceedings themselves (a situation which is not strictly speaking an eviction and which, therefore, may not be covered by the suspensions set out in Article 2 that we analyse in the following section). There are, however, other scenarios, such as the acquisition or award of a let property to a large holder that is a legal person, in which the suspension under Article 1.5 may overlap with those under Article 2.

    Q. What happens to transactions that had already been signed (Article 1.3 of RDL 29/2026)?

    A. The transitional regime preserves transfers formalised in a public deed before RDL 29/2026 came into force (8 October 2026), even if they are pending registration. However, such deeds may not subsequently be amended or extended by means of an addendum.

    Private contracts, earnest money (arras) agreements, and framework agreements not yet formalised in a public deed remain, in principle, subject to the new restriction.

    2. Suspension of evictions until 31 December 2030 and new obligation on the public authorities to cure arrears

    Royal Decree-Law 29/2026 establishes two regimes for the suspension of eviction proceedings (which we refer to as the "enhanced" and "ordinary" regimes). Both remain in force until 31 December 2030. Through the reform of the Civil Procedure Law (LEC), it also imposes a permanent obligation on the public authorities to cure the arrears of an economically vulnerable tenant where they do not offer the tenant suitable alternative accommodation.

    2.1 The two schemes for the suspension of evictions (Article 2 of Royal Decree-Law 29/2026)

    Article 2 of RDL 29/2026 does not expressly define the proceedings to which it applies: paragraphs 1 and 2 refer generically to "proceedings". The only guidance for interpretation is provided by the second transitional provision, which extends the new regime to the enforcement of decisions handed down in proceedings under Article 441.5 of the LEC, which in turn refers to numbers 1, 2, 4 and 7 of Article 250.1 of the LEC. This suggests that the measure naturally covers proceedings for the recovery of possession of a residential unit, and not mortgage foreclosure. Furthermore, mortgage foreclosure over a principal residence already has its own regime: Article 1 of Law 1/2013 suspends the eviction of particularly vulnerable debtors until 15 May 2028.

    It remains to be seen, however, whether Article 2 of RDL 29/2026 permits the suspension of all verbal proceedings (juicios verbales) under numbers 1, 2, 4 and 7 of Article 250.1 of the LEC (including proceedings for precariousness (precario) and summary protection of possession against occupants without title) or only those relating to leases. Article 2.2 points in the latter direction, as it calculates compensation on the basis of the "contractual rent not received", which suggests that the legislator was primarily considering evictions arising from leases.

    Nor does Article 2 of RDL 29/2026 specify whether the property subject to the proceedings must be the defendant's principal residence, unlike other protective provisions which do expressly require this, such as Article 1.5 of RDL 29/2026 itself or Article 1 of Law 1/2013. However, the requirement that the defendant have no "alternative accommodation" suggests that the measure is intended to protect the residential unit in which the defendant actually lives.

    Q. What requirements do both regimes have in common, and what distinguishes them?

    A. In both cases, the suspension is intended to benefit defendants who are in a vulnerable situation (whether certified by a report from social services or in accordance with the criteria set out in Article 441.7 of the LEC) and who have no alternative housing.

    Article 441.7 of the LEC gives the judge two guiding criteria to assess whether a vulnerable situation exists:

    1. Economic vulnerability: the judge may find it where rent and utilities (electricity, gas, water and telecommunications) exceed 30 per cent of the family unit’s income and, furthermore, that income is below three times the monthly Public Indicator of Multiple Effects Income (Indicador Público de Renta de Efectos Múltiples, IPREM). The IPREM is an index the Spanish State publishes each year to set income thresholds for public assistance. This limit increases for each dependent child, person over 65 or dependent person, and rises to five times the IPREM if any member has a disability, is dependent or is permanently unable to work.

    2. Social vulnerability: the judge may take this into account where dependent persons, victims of violence against women or minors live in the residential unit.

    However, Article 2 of RDL 29/2026 refers to vulnerability "certified on the basis of a report from social services, or […] by applying the criteria in Article 441.7". Its literal wording suggests that the social services report is a route separate from Article 441.7 of the LEC. If so, social services could treat as vulnerable a person who does not meet the Article 441.7 thresholds, taking other circumstances into account.

    The definition in Article 441.7 of the LEC also raises questions of its own. For example, it is unclear whether social vulnerability is enough on its own, without any income limit, and what "household" (unidad familiar) means.

    However, the effects of the suspension depend on who the claimant is. If the claimant is a property professional as described in Article 2.1 of RDL 29/2026, the enhanced suspension applies. For any other claimant, the ordinary suspension under Article 2.2 of RDL 29/2026 applies.

    Q. Do the regimes protect defendants where the proceedings have already ended or the eviction has already been ordered?

    A. Yes. Both suspension regimes apply even where a judgment, decree or order has ended the proceedings or ordered the eviction, as long as the eviction has not yet been carried out.

    Q. How long will these suspension regimes remain in force?

    A. The regimes are temporary. They will remain in force until 31 December 2030.

    Q. How does the enhanced suspension regime work (Article 2.1 of RDL 29/2026)?

    A. Under the enhanced suspension regime, where the claimant is a property professional as defined in Article 2.1 of RDL 29/2026 and the defendant is a vulnerable person with no alternative accommodation, the court shall suspend the proceedings by order. We explain who qualifies as a property professional in the following question. The suspension applies even if the proceedings had already been suspended in accordance with Article 441.5 of the LEC.

    The provision does not specify how long the stay of proceedings lasts. 31 December 2030 marks the end of the period during which the regime applies (the stay may be ordered "from the entry into force of this Royal Decree-Law until 31 December 2030"). However, the provision does not expressly state that this is also the date on which any stays already ordered are lifted. In our view, this is the most reasonable interpretation, given the temporary nature of the measure, but the text leaves room for doubt.

    Furthermore, Article 2.1 of Royal Decree-Law 29/2026 does not provide for a periodic review of the suspension, unlike Article 2.2.

    The enhanced suspension does not give the claimant a right to compensation, nor does it oblige the competent public authority to cure the arrears (see New obligation on the public authorities to cure arrears (Article 5.2 of RDL 29/2026, new Article 22.6 of the LEC)).

    Q. Who does the legislation consider to be property professionals for the purposes of applying this enhanced suspension regime?

    A. Article 2.1 of RDL 29/2026 applies the enhanced suspension to entities, with or without legal personality, engaged in acquiring properties or portfolios of non-performing mortgage loans at a price significantly below their market valuation. In both cases, the purpose of the acquisition must be: (i) to circumvent the mechanisms that safeguard the social function of housing; or (ii) to maximise the return on investment through disproportionate rents or resale prices, or by using the properties for non-residential purposes.

    The definition relies on indeterminate legal concepts, such as a price that is "significantly below" market value or "disproportionate" rents and prices. It also relies on intent requirements, which will not be easy to prove in court. Each case will therefore require individual assessment, and there is considerable legal uncertainty as to which operators will ultimately fall within the enhanced regime.

    Furthermore, the element of intent does not appear in the reference in Article 1.1 to entities engaged in purchasing at a discount (which bars them from acquiring residential units for less than 70 per cent of their market value). This suggests that the concept set out in Article 2.1 is more restrictive than that in Article 1.1, meaning that being subject to the acquisition restriction on speculative activity does not, in itself, imply being subject to the enhanced suspension.

    The regulation expressly excludes from this definition territorial public authorities, as well as other public bodies and public-sector companies whose purpose is the development and management of social and affordable housing.

    Q. How does the ordinary suspension regime work (Article 2.2 of RDL 29/2026)?

    A. If the claimant is not a property professional as defined in Article 2.1 of RDL 29/2026 and the defendant is a vulnerable person, the court will assess whether the competent public authority has offered the defendant decent and suitable alternative accommodation. If it has not, the court will request, through the channel designated by the relevant autonomous community, a report from the public authority responsible for housing and social services on the resources at its disposal. If the authority fails to respond or has no resources, the court will suspend the proceedings until measures are taken and alternative accommodation is guaranteed.

    Unlike the suspension provided for in Article 2.1 of RDL 29/2026, this suspension will be reviewed every twelve months and will be lifted:

    (a) if the defendant’s vulnerability ceases;

    (b) if suitable and effective alternative accommodation is made available to the defendant or if the defendant rejects it without just cause (following a hearing of the parties); or

    (c) three years after it is ordered.

    We understand that, in any event, this suspension may not be extended beyond 31 December 2030, the date on which the regime expires, although the legislation does not expressly state this.

    Q. Is the claimant entitled to compensation?

    A. Only if the claimant is a natural person or a legal person engaged in affordable or social letting on a regular basis.

    With regard to legal persons, a similar doubt arises to the one we highlighted when analysing the exceptions in Article 1.2: the provision does not specify what is meant by "affordable" letting. In this case, Article 2.2 does not use the expression "at an affordable price", which links to the definition in Article 9. The most immediate reference therefore appears to be the definition of affordable housing in Article 14 (a price not exceeding 30 per cent of the median income of the usual household in the municipality). However, Article 2.2 does not expressly refer to it either, and one could argue for the definitions in Law 12/2023 on Housing or even those applicable at regional level. Nor does the provision clarify whether the legal person must be engaged exclusively or primarily in affordable or social letting, or whether the residential unit subject to the proceedings must be intended for that use.

    The competent housing authority bears the compensation, and the court will award it in the same order that suspends the proceedings.

    Compensation will cover, at most, the contractual rent not received, unpaid utilities and the claimant's legal costs. It does not cover hypothetical loss of earnings or non-pecuniary damage, but late-payment interest will apply if the authority delays payment.

    Neither the suspension nor the compensation releases the defendant from the obligation to keep paying the rent due.

    Q. Might the suspension not apply if the claimant is a natural person?

    A. Yes, in the case of (i) vulnerable claimants or (ii) claimants with two or fewer residential units:

    (a) Vulnerable claimants: the court may refuse the suspension if, having regard to the relevant circumstances, it considers that the claimant’s economic or housing vulnerability must take precedence. This assessment is not available where the claimant is a legal person or a natural person classified as a large holder, whose potential vulnerability is not taken into account.

    RDL 29/2026 does not define what is meant by the claimant’s "economic or housing" vulnerability. For economic vulnerability, the criteria in Article 441.7 of the LEC could apply by analogy. Its first paragraph already requires the judge to assess "any situations of vulnerability that may also apply to the claimant", although its thresholds are designed for the occupant’s family unit. We discuss Article 441.7 of the LEC in greater detail in the previous question on the requirements common to both suspension regimes. As regards housing vulnerability, however, there is no legal benchmark: it is unclear whether it is enough for the property owner to need the residential unit for themselves or for a family member, or whether they must have no other accommodation available. In practice, therefore, the assessment is left to the discretion of the court.

    (b) Small property owners: suspension on the grounds of the defendant’s economic vulnerability does not apply where the claimant is a natural person who owns two or fewer residential units.

    In this second case, the literal wording of the provision does not require the small property owner to prove their own vulnerability.

    However, the provision only excludes the defendant’s economic vulnerability. It can therefore be argued that their social vulnerability (for example, the presence in the residential unit of minors, dependent persons, or victims of violence against women) could indeed justify a stay of proceedings even against a small property owner. If this were the case, the protection afforded to such owners would be more limited than it appears at first glance.

    2.2 New obligation on the public authorities to cure arrears (Article 5.2 of RDL 29/2026, new Article 22.6 of the LEC)

    Q. How does this new obligation work?

    A. It is a permanent obligation. It is included in the LEC and is therefore not subject to the temporary nature of the suspension regimes under Article 2 of RDL 29/2026. It will remain in force beyond 2030. If the defendant tenant is economically vulnerable and the competent public authority does not offer them suitable alternative accommodation, the authority must pay or deposit the sums claimed (enervación extraordinaria). If it fails to do so in time, it is subrogated to the tenant’s position as debtor.

    This applies to evictions for non-payment of rent or sums due (Article 250.1.1 of the LEC), where the tenant proves economic vulnerability under the "legally prescribed conditions", unless the claimant is one of the property professionals referred to in Article 2.1 of RDL 29/2026.

    The provision does not specify what these "legally prescribed conditions" for proving vulnerability are. Unlike Article 2 of RDL 29/2026, it makes no mention of a social services report or social vulnerability. If the reference is to the economic criteria in Article 441.7 of the LEC, a tenant who is merely socially vulnerable could not benefit from the public-authority cure obligation, but could, in principle, rely on the ordinary suspension under Article 2.2.

    The procedure is as follows:

    (a) Once vulnerability has been established, the competent authority is immediately notified. It has a non-extendable period of two months to provide suitable alternative accommodation or, failing that, to pay or deposit with the court all sums claimed and accrued up to that point, plus costs. In the meantime, the proceedings and, where applicable, the eviction are suspended. If there is a delay in the payment ordered by the court, late-payment interest accrues.

    (b) Once the deadline has passed, there are three possible scenarios:

    (i) If the public authority offers suitable alternative accommodation, it is not obliged to make the cure payment.

    In this case, we understand that the eviction proceedings will continue.

    (ii) If the public authority pays or deposits the sum in time, the proceedings end and the lease agreement remains in force.

    In this scenario, we understand that it is the tenant who remains obliged to pay any rent due in the future.

    (iii) If the public authority neither offers an alternative nor pays, it is automatically subrogated to the tenant’s position as debtor. There is no eviction and the lease agreement remains in force until its expiry, provided the tenant's economic vulnerability persists.

    We consider that subrogation releases the tenant from liability: the authority takes their place as the debtor of the amounts claimed and of the rent accruing while the economic vulnerability persists. Article 2.2 of RDL 29/2026 expressly maintains the tenant’s obligation to keep up to date with rent payments; the new Article 22.6 of the LEC does not include this requirement. Nor does the provision allow the public authority to recover the amounts paid from the tenant. Nevertheless, a cumulative interpretation could be argued, under which the tenant remains liable to the landlord alongside the public authority.

    The provision does not address what happens if the subrogated public authority also fails to pay the rent. The landlord cannot seek eviction and has no specific means of claiming payment.

    Nor does it clarify whether subrogation covers extensions to the lease agreement or ends upon its initial "expiry".

    The State will compensate the autonomous communities for these expenses, except for late-payment interest. In the Basque Country and Navarre, funding is agreed bilaterally in accordance with their own economic regimes.

    Q. How does the public-authority cure obligation fit with the tenant’s right to cure under Article 22.4 of the LEC?

    A. Article 22.4 of the LEC allows the tenant to use its right to cure only once to stop an eviction for non-payment of rent or other amounts due. To do so, the tenant must pay the landlord or deposit with the court all amounts claimed and accrued up to that point. They may not do so if the landlord had demanded payment in a verifiable manner at least thirty days before the claim was filed and, at the time the claim was filed, the tenant had still not paid.

    The new obligation on the public authorities to cure arrears under Article 22.6 of the LEC operates independently of that right:

    (a) It does not count as a prior cure for the purposes of Article 22.4 of the LEC. Consequently, the tenant may later use its own right to cure, where applicable.

    (b) It applies even if the landlord demanded payment in a verifiable manner under Article 22.4 of the LEC before bringing the claim.

    Q. How do the new obligation on the public authorities to cure arrears under Article 22.6 of the LEC and the extraordinary suspension regimes under Article 2 of RDL 29/2026 relate to one another?

    A. The obligation and the suspension regimes do not apply at the same time. The legislation establishes an order of priority depending on who the claimant is.

    (a) If the claimant is one of the "property professionals" referred to in Article 2.1 of RDL 29/2026, the enhanced suspension applies. The public-authority cure obligation never applies, as Article 22.6 of the LEC expressly excludes this scenario.

    (b) If the claimant is any other party, a distinction must be made depending on the proceedings:

    (i) In eviction proceedings for non-payment of rent or sums due (Article 250.1.1 of the LEC), the public-authority cure obligation under Article 22.6 of the LEC applies first. The ordinary suspension under Article 2.2 of RDL 29/2026 applies only where the public-authority cure obligation does not.

    (ii) In all other proceedings falling within the scope of Article 2.2 of RDL 29/2026 (in which, as there is no unpaid rent, the public-authority cure obligation does not apply), the ordinary suspension applies directly.

    Q. Does it apply to proceedings that are already underway (Transitional Provision 2 of RDL 29/2026)?

    A. Yes. It applies to the enforcement of decisions issued in proceedings under Article 441.5 of the LEC that were ongoing when RDL 29/2026 entered into force (8 October 2026), provided that eviction has not yet taken place. Before the proceedings continue, regardless of the stage they have reached, the court must first apply the new Article 22.6 of the LEC.

    3. Temporary and extraordinary measures in residential leases

    Final Provisions 5 and 6 of RDL 29/2026 set out two temporary and extraordinary measures that favour tenants and apply to lease agreements already in force: (i) an extraordinary cap on rent reviews and (ii) an extraordinary extension of up to two years.

    3.1 Extraordinary cap on rent reviews (Final Provision 6 of RDL 29/2026)

    Q. Which lease agreements are affected?

    A. Residential lease agreements subject to Law 29/1994 of 24 November on Urban Leases (LAU) where the rent is due for review because the lease anniversary falls between the entry into force of RDL 29/2026 (8 October 2026) and 31 December 2027. For a rent review to apply, the contract must, in all cases, contain an express clause providing for such review (Article 18.1 of the LAU).

    In our view, the cap does not apply to residential lease agreements entered into before 1 January 1995, where the rent is reviewed in accordance with the specific rules set out in the transitional provisions of the LAU. The Final Provision 6 refers solely to agreements "subject" to the LAU, and when RDL 29/2026 extended rent review caps to earlier contracts (Transitional Provision 4 of Law 12/2023 on Housing), it did so only in respect of agreements subject to the 1994 LAU. However, a broader interpretation cannot be ruled out.

    Q. What rent review is allowed in these cases?

    A. It depends on the current rent under the lease agreement.

    (a) If the rent exceeds the maximum limit applicable under the State Reference System for Housing Rent Prices (SERPAVI), no increase may be applied. SERPAVI is calculated in accordance with the methodology and criteria established by a resolution of the Ministry of Housing and Urban Agenda and can be consulted on its website (https://www.mivau.gob.es/vivienda/alquila-bien-es-tu-derecho/serpavi) (in Spanish only). Law 12/2023 of 24 May on the right to housing (Housing Law) uses it as a rent cap for certain new lease agreements in stressed residential market areas (Article 17.7 of the LAU).

    (b) In all other cases, the increase is the one that results from a new agreement between the parties and, in the absence of such an agreement, may not exceed 2 per cent.

    Final Provision 6 does not limit the rule in sub-paragraph (a) to stressed residential market areas; therefore, its literal wording allows it to be applied throughout the territory. However, it reproduces the wording of Article 17.7 of the LAU ("maximum limit on the applicable rent in accordance with the system of reference price indices"), which applies only in declared stressed residential market areas; outside such areas, the Ministry itself considers the index to be merely indicative. It cannot therefore be ruled out that it will be argued that the rule in sub-paragraph (a) applies only in such areas and that, outside them, sub-paragraph (b) applies (a new agreement or, failing that, a maximum of 2 per cent).

    SERPAVI only provides figures for residential units with a floor area of between 30 and 150 m² in multi-occupancy residential buildings more than five years old. Where no index exists, the rent cannot exceed it, so sub-paragraph (b) applies.

    Q. What happens from 2028 onwards?

    A. Any rent reviews taking effect from 1 January 2028 will no longer be subject to this extraordinary cap. From that date, the general rules of Article 18.1 of the LAU will apply:

    (a) If there is no express provision in the agreement, the rent is not reviewed.

    (b) If there is an express provision but the index or methodology is not specified, the rent is reviewed in line with the annual change in the Reference Index for the Annual Adjustment of Residential Lease Agreements (IRAV).

    In any event, the annual review may not exceed the change in the IRAV.

    The IRAV is the index that the Housing Law incorporated into the LAU as a cap on rent reviews (Additional Provision 11 of the LAU), replacing the reference to the Consumer Price Index (CPI).

    Agreements entered into before the Housing Law came into force are also subject to this cap, in accordance with Transitional Provision 4 of the Housing Law, as amended by RDL 29/2026.

    3.2 Extraordinary extension of existing lease agreements (Final Provision 5 of RDL 29/2026)

    Q. Which lease agreements can be extended?

    A. Agreements for a principal residence subject to the LAU that were in force when RDL 29/2026 entered into force (8 October 2026) and in which any of the following expires: (i) the mandatory extension under Article 9.1 of the LAU before 31 December 2028; (ii) the extension provided for in Articles 10.1 and 10.2 of the LAU (tacit extension and extension on grounds of vulnerability); or (iii) where applicable, the period of tacit renewal under Article 1566 of the Civil Code. Furthermore, it is essential that the tenant is up to date with rent payments and has been so for the preceding eight months.

    Although Final Provision 5 expressly links only the date of 31 December 2028 to the expiry of the mandatory extension, there are sound arguments for interpreting it as also applying to the expiry of the tacit extension, the extension on grounds of vulnerability and the tacit renewal. This is a temporary and exceptional measure, which must be interpreted restrictively, and it would make no sense for it to have no time limit in these cases. However, the literal wording supports the opposite interpretation.

    In our view, the extension does not apply to contracts agreed for a term equal to or longer than the statutory minimum (e.g. 10 years) which terminate upon expiry following the landlord's notice of non-renewal. These leases do not end upon the expiry of any of the periods listed in Final Provision 5, and an exceptional measure should not be extended to cases not expressly provided for.

    The tenant must apply for the extension (it does not take effect automatically).

    We consider that the tenant cannot request the extension at any time. The right only arises upon the expiry of one of the periods listed in Final Provision 5. This is confirmed by the requirement to have been up to date with rent payments for eight months' and by the exceptions in favour of the landlord that we discuss in the following question, which presuppose imminent termination.

    Q. Can the landlord refuse to accept the extension?

    A. The landlord is obliged to accept the extension, except in the following cases:

    (a) if the parties have agreed on other terms or conditions by mutual consent;

    (b) if the parties have entered into a new lease agreement;

    (c) if the landlord has given notice, within the time limits and under the conditions set out in Article 9.3 of the LAU, of their need to occupy the residential unit for themselves or for their family members. This exception applies even if the lease agreement does not expressly provide for the right to repossess the residential unit on grounds of necessity, provided that there is a genuine and substantiated reason.

    Furthermore, the extension does not apply if the landlord and tenant agree to renew the lease agreement, or to enter into a new one, with a rent that is at least 5 per cent lower than that of the current lease agreement.

    There are arguments to support that the new lease agreement precludes the extension even if the rent is not reduced by 5 per cent. Paragraph 1 of Final Provision 5 provides for this without any condition regarding rent, while paragraph 2 adds the "renewal" of the current lease agreement, which, without that exclusion, would remain subject to the extension. However, given that paragraph 2 also refers to the new lease agreement, there is a risk that the reduction may be deemed required in all cases.

    Finally, this extraordinary extension is incompatible with the extraordinary extension provided for in Article 10.3 of the LAU for residential units located in stressed residential market areas (for annual periods, up to a maximum of three years), which takes precedence where applicable. The latter requires the residential unit to be in a declared stressed residential market area while that declaration is in force.

    Final Provision 5 only regulates its relationship with the extension under Article 10.3 of the LAU, which raises doubts as to its compatibility with other extensions:

    (i) Extension on grounds of vulnerability (Article 10.2 of the LAU). Given that the extraordinary extension also applies upon expiry of the extension under Article 10.2 of the LAU, its literal wording appears to allow the tenant to combine both extensions, up to a total of three additional years (one year under the extension on grounds of vulnerability and up to two years under the extraordinary extension under Final Provision 5). The legislation does not, however, clarify whether this combination is what the legislator intended, unlike in the case of the extension under Article 10.3 of the LAU, which it expressly declares to be incompatible.

    (ii) Applications made under RDL 8/2026. RDL 29/2026 considers these to be validly submitted without the need for further notification (see Transitional Provision 1), but the legislation does not clarify whether the extension period already enjoyed under RDL 8/2026 is counted towards the maximum of two years set out in Final Provision 5 of RDL 29/2026.

    (iii) Applications made under RDL 26/2026. RDL 29/2026 does not expressly preserve them, unlike those made under RDL 8/2026. It can therefore be argued that they ceased to have effect upon the repeal of RDL 26/2026 and that the tenant must submit a new application in accordance with Final Provision 5.

    (iv) Extension in a stressed residential market area (Article 10.3 of the LAU). In our view, the incompatibility established by Final Provision 5 implies that the tenant may only benefit from one of the two extensions, not both in succession; thus, once the extension under Article 10.3 of the LAU has expired, the extension under Final Provision 5 would not apply.

    Q. For how long can these lease agreements be extended?

    A. For annual periods up to a maximum of two additional years.

    As the extension is structured "for annual periods and up to a maximum of two additional years", it is unclear whether the second year requires a new application from the tenant and whether the requirements must be met again at that time. In our view, the reference to annual periods supports the argument that the requirement to be up to date with rent payments must be maintained throughout the extension and must also be assessed at the start of the second year. In any event, non-payment during the extension would allow the landlord to terminate the lease agreement in accordance with the general rules of the LAU.

    Q. Under what conditions does the extension take place?

    A. The terms and conditions of the current agreement remain in force during the extension period.

    We consider that these terms include the rent review clause, subject, where applicable, to the extraordinary cap in Final Provision 6 until 31 December 2027 and, thereafter, to the general rules of Article 18.1 of the LAU.

    4. Key measures with a structural impact on the rental market: the reform of the LAU

    Article 3 of RDL 29/2026 introduces a far-reaching reform of the LAU intended to be permanent (unlike the temporary measures outlined in the previous section Temporary and extraordinary measures in residential leases).

    Application of the reform of the LAU to existing contracts. With the exception of seasonal leases (Transitional Provision 8 of the LAU), RDL 29/2026 does not include a general transitional provision, unlike the reforms of 2013, 2018, 2019 and 2023. In our view, there are arguments that existing agreements continue to be governed by the rules applicable at the time they were entered into. RDL 29/2026 itself, in rewriting Transitional Provision 4 of the Housing Law, reiterates that agreements entered into before that Law retain, except in matters of extensions and rent reviews, "the legal regime […] in force at the time they were entered into", and it would be difficult to justify treating those entered into subsequently any differently. Furthermore, terms validly agreed under the previous legislation (such as the waiver of the right of pre-emption, the passing on of taxes to the tenant or additional guarantees) should not be rendered ineffective without an express provision to that effect (Article 2.3 of the Civil Code). However, the absence of a general transitional provision creates significant uncertainty, particularly regarding events occurring in existing agreements after the entry into force of RDL 29/2026 (for example, the sale of the residential unit or the handover of possession upon expiry of the agreement), to which the new rules might apply.

    Below, we analyse the amendments which, in our view, will have the greatest impact on portfolio management.

    4.1 Renting by the room

    Q. What changes for landlords? (Articles 2.1 and 2.3 of the LAU)

    A. Until now, the letting of rooms was generally considered to be excluded from the LAU and subject to the Civil Code, where freedom of contract prevails. RDL 29/2026 now expressly includes the letting of a room or other space within the scope of the LAU, whether as a principal residence or as temporary residential lease, which we discuss below. Consequently, these agreements are subject to the mandatory provisions of the LAU (the Civil Code will only apply on a supplementary basis).

    The letting of rooms or other spaces by non-profit third-sector social action entities, as part of programmes for the reception, inclusion, or accommodation of vulnerable people, and for the duration of the programme, is excluded from the scope of the LAU.

    In any event, the new Additional Provision 12 of the LAU provides that these rules (and those governing temporary leases) are without prejudice to any provisions that the autonomous communities have enacted or may enact in the exercise of their powers, which apply within their respective territorial jurisdictions. Catalonia has done so through Law 11/2025 of 29 December on measures relating to housing and town planning (which has been appealed to the Constitutional Court), and Navarre through Regional Law 11/2026 of 2 July, regulating the letting of rooms.

    Q. Are there rent caps for room lettings (Article 17.9 of the LAU)?

    A. Yes. The total rent from lease agreements for individual rooms that are in force at the same time for the same residential unit must not exceed the rent under the single lease agreement for the entire residential unit. If the residential unit is in a stressed residential market area, the rent under the single lease agreement (or, failing that, the total rent from the room lease agreements in force at the same time for the same residential unit) must comply with the applicable rent caps. Finally, if the room lettings are temporary, the limit on rent between successive temporary leases, which we discuss below, also applies.

    The provision refers to "the rent under the single lease agreement for the entire residential unit", but does not clarify which rent should be taken into account when the residential unit has never been let in its entirety, nor which rent should apply if there have been several single lease agreements, at different times or with different rents. Outside stressed residential market areas, this lack of a basis for comparison suggests that the limit does not apply in such cases. In stressed residential market areas, applying limits designed for the entire residential unit to individual rooms presents practical difficulties, as SERPAVI does not provide figures per room.

    4.2 Temporary residential leases

    Q. What has changed (Articles 2.3, 7 and 9.4 of the LAU)?

    A. Seasonal leases are no longer governed by the rules for leases for use other than housing (where the freedom of contract prevailed). RDL 29/2026 creates a new category of "temporary" (non-tourist) residential lease, alongside the lease of a principal residence (vivienda habitual).

    A temporary residential lease is defined as one that meets the tenant's housing needs when the tenant is temporarily displaced from their usual place of residence for a justified and verifiable reason.

    Q. What is the duration (Article 9 bis of the LAU)?

    A. As a general rule, more than 31 days but not exceeding twelve months. If the reason for the lease persists upon expiry, the agreement may be extended by express agreement between the parties, up to a maximum of twelve months in total. This period may only be exceeded if the reason for the lease's temporary nature continues beyond twelve months.

    If the term exceeds twelve months without justification based on the temporary nature of the situation, or if there are more than two consecutive temporary lease agreements between the same parties and in respect of the same residential unit, the first such agreement is deemed to have been entered into as a lease of a principal residence from the outset. The rules on minimum term and extensions then apply in full.

    As with room lettings, these rules are without prejudice to any rules that the autonomous communities have enacted or may enact regarding temporary leases in the exercise of their powers.

    The state rules on temporary residential leases and room lettings are without prejudice to the regional regulations enacted in the exercise of the powers of the autonomous communities. However, the legislation does not clarify whether the regional rules completely supersede the state rules within their territory or whether the state rules apply on a supplementary basis to fill any gaps. This issue must be analysed in each autonomous community, depending on the scope of its rules and the legal basis on which they are founded.

    Furthermore, temporary transfers of use of all or part of a residential unit for tourism purposes, which are subject to sector-specific regulations, fall outside the scope of the LAU. Their maximum duration is set by the competent tourism authorities and may under no circumstances exceed 31 days (Article 5.e of the LAU).

    Q. Does the reason for the temporary nature of the lease need to be stated in the agreement?

    A. Yes. Temporary residential lease agreements must expressly state the reason for the tenant's temporary relocation. This reason must be genuine and verifiable. The landlord bears the burden of proving it. If the reason is not duly stated in the agreement, the agreement ceases to be temporary and is governed by the rules applicable to the lease of a principal residence, with retroactive effect from the date it was entered into.

    Q. Do any rent caps apply to these temporary lease agreements (Articles 17.6, 17.7 and 17.8 of the LAU)?

    A. Where several temporary lease agreements are successively entered into for the same residential unit, the annual rent increase under the later agreement may not exceed the IRAV in force.

    Unlike Article 9 bis.2 of the LAU, Article 17.8 does not require the lease agreements to be entered into between the same parties. We therefore understand that the limit applies even if the tenant changes. However, the provision does not clarify which lease agreements are to be considered "successive" or how the "annual" increase is calculated when the residential unit remains unlet between one lease agreement and the next. It could be argued that the limit only applies between consecutive lease agreements, without any significant interruption, and that the IRAV should be applied in proportion to the time elapsed.

    Further doubts arise regarding the possibility of applying rent caps for stressed residential market areas to temporary leases.

    The limits in paragraphs 6 and 7 of Article 17 of the LAU refer to "residential lease agreements", a category which now includes temporary leases, and paragraph 9 expressly states that they apply to rooms, whether let as principal residence or on a temporary basis. All of this suggests that they also apply to temporary leases in stressed residential market areas, in addition to the limit in paragraph 8 on successive leases. However, it could be argued that paragraph 8 establishes a specific regime for temporary leases which displaces paragraphs 6 and 7.

    Q. Are there any other specific rules for temporary leases (Articles 11, 21 bis and 36.5 of the LAU)?

    A. Yes. The tenant under a temporary lease agreement may terminate the agreement once one month has passed since it was signed, giving just ten days' notice and without paying compensation.

    Furthermore, the additional guarantee (on top of the statutory deposit) may not exceed one month's rent.

    Finally, in temporary residential lease agreements, the landlord is responsible for minor repairs resulting from normal wear and tear (unlike in leases of a principal residence). After the tenant notifies the landlord of the need for such repairs, the landlord has a maximum of five working days to respond. If they fail to do so, the tenant may carry out the necessary repairs and claim the cost from the landlord or, after providing evidence of the cost, deduct it from the following month's rent.

    Q. What happens to seasonal leases entered into before RDL 29/2026 (Transitional Provision 8 of the LAU)?

    A. Seasonal leases entered into before RDL 29/2026 remain subject to the rules for leases for use other than housing until the agreed term expires, at which point they end without the possibility of extension. If they are renewed, they are governed by the rules on temporary residential leases.

    4.3 End of freedom of contract for "luxury" rentals

    Q. Can leases of large or high-rent residential units still be governed by freedom of contract?

    A. No. RDL 29/2026 repeals the second paragraph of Article 4.2 of the LAU, which allowed leases of residential units exceeding 300 m², or with an initial annual rent exceeding 5.5 times the annual national minimum wage, to be governed by freedom of contract, provided that the entire residential unit was let. Until now, the title of the LAU dealing with residential leases only applied to such leases on a supplementary basis. Since 8 October 2026, all residential leases, regardless of their floor area or rent, are subject to the mandatory regime (minimum term, extensions, limits on rent reviews and, where applicable, rent caps in stressed residential market areas, among other provisions).

    Agreements of this type entered into before 8 October 2026 were agreed under a regime of freedom of contract. In our view, there are sound arguments that they retain their original regime until their expiry: RDL 29/2026 does not expressly subject them to the new regime, and to hold otherwise would render validly agreed terms regarding duration, extensions and rent ineffective. However, in the absence of a general transitional provision, the risk remains (see the general uncertainty regarding the application of the reform to existing agreements in the section Key measures with a structural impact on the rental market: the reform of the LAU).

    4.4 Right of pre-emption

    Q. Does the tenant have a right of pre-emption if the residential unit is sold together with other assets (Article 25 of the LAU)?

    A. Yes. RDL 29/2026 reverses the previous rule, which excluded the rights of first refusal and redemption (tanteo y retracto) in certain joint sales. These rights now apply when the let residential unit is transferred together with other residential units, premises, real estate, or assets, provided that the residential unit is legally identifiable as a separate unit. This includes both the sale of an entire building and that of a portfolio of assets.

    The provision does not define what is meant by a "legally identifiable" residential unit. In our opinion, the term refers to residential units which, at the time of the sale, can be transferred independently without the need for prior legal steps, such as the horizontal division of the building. The wording of the provision supports this reading: it does not oblige the seller to carry out such steps, nor does it regulate how the right would be exercised in such a case or who would bear the cost. Consequently, in buildings that have not been divided horizontally, the tenant would not, in principle, have a right of pre-emption in the event of a joint sale. The matter remains unresolved, and the interpretation of the courts and the Directorate-General for Legal Security and Public Trust will be decisive.

    Furthermore, in the case of joint sales, housing legislation may recognise rights of first refusal and redemption over the entire property in favour of the body designated by the competent public authority. This right is subsidiary to that of the tenant.

    Q. How is the price of each residential unit determined in such cases?

    A. The total price is apportioned proportionally, using objective and verifiable criteria. The cadastral reference value takes priority and, failing that, an independent valuation. Any price allocations intended to prevent or hinder the exercise of these rights are ineffective against the tenant.

    The notice to the tenant must state the price allocated to their residential unit and the criteria used to determine it. Its effects expire after 180 calendar days.

    If no notice is given, if any of this information is omitted, or if the actual price or the other terms prove to be more favourable, the tenant may exercise the right of redemption. The deed must set out the price allocated and the criteria, and registration of the sale requires evidence that the required notices have been served.

    Q. Can the parties waive these rights?

    A. In residential leases, no. The parties can no longer include in the agreement the tenant's waiver of these rights.

    RDL 29/2026 does not contain a transitional provision regarding waivers of the right of pre-emption validly agreed under the previous legislation. In our view, there are arguments to support the view that such waivers remain valid, as they were valid agreements at the time they were entered into. However, the right arises upon the sale, which is an event occurring after the entry into force of RDL 29/2026; consequently, there is a risk that the new prohibition may be deemed applicable (see the general uncertainty regarding the application of the reform to existing agreements in the section Key measures with a structural impact on the rental market: the reform of the LAU).

    Article 31 of the LAU, which has not been amended, refers to Article 25 in respect of leases for use other than housing. As these leases are governed primarily by the will of the parties (Article 4.3 LAU), in our view the waiver remains valid in such cases. To avoid any doubt, we recommend that new agreements expressly exclude the application of Article 25 of the LAU and include a waiver by the tenant of their rights of pre-emption.

    4.5 Expenses

    Q. Which expenses may be passed on to the tenant (Articles 20.1 and 36.5 of the LAU)?

    A. The parties may continue to agree that the tenant bears the general expenses of the residential unit, its utilities, charges, and liabilities that cannot be individualised. The agreement must be in writing and specify the annual amount of these expenses as at the date of the agreement. The costs of utilities metered individually always remain the responsibility of the tenant.

    However, RDL 29/2026 introduces new prohibitions.

    (a) Taxes associated with the property, including the Real Estate Tax (Impuesto sobre Bienes Inmuebles, IBI), may not be passed on to the tenant, unless the tenant is the person liable for the tax;

    (b) nor may the tenant be required to bear the cost of services that are not essential to the signing of the lease agreement (unless the tenant has expressly requested them after being informed of their optional nature and their cost); and, finally,

    (c) the tenant may not be required to take out rent default insurance or other similar cover.

    Furthermore, in buildings that have not been divided into horizontal property (propiedad horizontal), community expenses may not be charged to the tenant. Where the building has been so divided, the allocation of such expenses is based on the participation quota (cuota de participación).

    Additional Provision 1 of the LAU, which RDL 29/2026 does not amend, sets out a specific regime for leases of officially-subsidised housing (viviendas de protección oficial). It allows landlords to charge the actual cost of services (paragraph 4) and applies in the absence of regional legislation (paragraph 7). Leases of publicly-developed housing (arrendamientos de promoción pública) are governed by their own specific rules and, in matters not regulated therein, by the LAU (paragraph 8). On this basis, Supreme Court judgments 707/2025 and 710/2025 of 9 May held that the regional legislation of Madrid takes precedence, as it allows the actual cost of services to be passed on without quantifying the annual amount. According to the Supreme Court, the requirements of Article 20.1 of the LAU are "limited to residential units on the free and unregulated market".

    In our view, there are sound arguments that this doctrine remains valid, as the reform does not amend Additional Provision 1 of the LAU and the doctrine rests on the primacy of specific legislation. The argument is stronger for community expenses and service costs than for taxes because the Madrid legislation also refers to "other charges authorised by the applicable legislation", which could bring the new prohibition on passing on the IBI into play.

    In addition, the category of "officially-subsidised housing" is linked to Royal Decree-Law 31/1978 and does not necessarily correspond to the current forms of protected housing, whether regional or under the Housing Law. In the judgments cited, the Supreme Court applied Additional Provision 1 of the LAU to publicly protected residential units in the Community of Madrid without analysing whether they fall within the category of "officially-subsidised housing". This supports its application to regional schemes. However, those were publicly-developed residential units. Its application to privately-developed protected residential units, or to units that do not clearly fall within that category, may therefore be disputed. The classification of each residential unit and the applicable regional regulations will need to be examined case by case.

    4.6 Early termination by the tenant, repairs, and the end-of-lease document

    Q. Can a penalty clause still be included in the lease if the tenant leaves early (Article 11 of the LAU)?

    A. Not where the tenant terminates the lease in accordance with the law. Previously, the LAU allowed the parties to agree that a tenant who terminated the lease would compensate the landlord with one month's rent for each year remaining on the lease. Now, the tenant may terminate the lease once at least six months have elapsed, provided they give the landlord at least thirty days' notice. Termination exercised in this way does not give rise to any right to compensation for the landlord.

    In the case of temporary residential leases, the tenant may terminate the agreement once at least one month has elapsed since the lease was signed, subject to a minimum of ten days' notice. In this case, too, no entitlement to compensation arises.

    The legislation excludes compensation only for termination "exercised in this way", that is, after six months (or one month, in the case of temporary residential leases) and with the statutory notice period.

    In our view, there are arguments that it remains valid to agree on compensation if the tenant vacates the residential unit before these time limits or without giving the required notice. In such cases, the tenant is not exercising a right to terminate but is in breach of the agreement. However, the amount should be proportionate to the loss incurred; for example, the rent corresponding to the omitted notice period or to the period remaining until the six-month mark, in order to lower the risk that a court reduces it.

    Q. Are there any new rules regarding the maintenance of let residential units (Article 21.5 of the LAU)?

    A. Yes. RDL 29/2026 adds a new paragraph 5 to Article 21 of the LAU. Where there is damage or disrepair affecting the habitability, safety, or health conditions of the residential unit, or where maintenance repairs are generally required, the tenant may ask the landlord in writing to carry out the repairs, enclosing a reasonable quotation.

    The landlord has fifteen calendar days from receipt of the request to accept the quotation, propose an alternative repair or carry out the repair directly. If the landlord fails to respond within that period or refuses without just cause, the tenant may carry out the works and deduct the cost from future rent payments (self-help remedy). The cost must be reasonable, proportionate to the damage to be rectified, and supported by documentary evidence.

    We consider that if the landlord proposes an alternative repair within the time limit, they have responded to the request and the tenant cannot carry out the works themselves, as the law only permits this in the event of a failure to respond or an unjustified refusal.

    This is without prejudice to the tenant’s right to continue carrying out urgent repairs directly, under Article 21.3 of the LAU, which RDL 29/2026 does not amend.

    Q. What is the new end-of-lease document (Article 36.7 of the LAU)?

    A. Upon termination of the lease agreement, the parties must record in writing the condition of the residential unit at the time of handover. They do so in an end-of-lease document signed by both parties.

    If this document is not signed, or if it does not record any damage, the residential unit is presumed, unless proven otherwise, to have been handed over in an adequate state of repair.

    To withhold the statutory security deposit on account of damage, the landlord must rebut this presumption.

    The presumption relates solely to the condition of the residential unit. It therefore does not affect the withholding of the deposit to cover other debts, such as unpaid rent or utility bills.

    In our view, if the tenant refuses to sign the end-of-lease document without just cause, they should not be able to benefit from the presumption. In any event, the presumption is subject to proof to the contrary.

    In practice, we recommend asking the tenant, in a verifiable manner, to sign this end-of-lease document and documenting the condition of the residential unit through independent means, such as a notarial record (acta notarial) or a dated photographic record. It is also advisable to have a detailed inventory of the residential unit's initial condition, which facilitates comparison.

    5. Credit assignments and new security over movable assets

    Final Provision 1 of RDL 29/2026 adds a new Article 25 bis to Law 5/2019 of 15 March on real estate credit agreements (LCCI), which strengthens the position of the assigned debtor in credit assignments. Furthermore, Article 15.1 of RDL 29/2026 amends Article 12 of the Law of 16 December 1954 on chattel mortgages (hipoteca mobiliaria) and non-possessory pledges (prendas sin desplazamiento) (LHMPSD) to include a new category of asset eligible for a chattel mortgage.

    5.1 Credit assignments (Final Provision 1 of RDL 29/2026 and Article 25 bis of the LCCI)

    Q. What changes for the purchaser of a real estate credit portfolio?

    A. The borrower may raise against the assignee the same defences and objections that they had against the original creditor, including set-off in accordance with the Civil Code. Any codes of good practice to which the assignor had adhered remain applicable, and the assignor and assignee must agree on the way of preserving them that is least burdensome for the debtor. The assignment must be notified to the borrower, unless the original lender continues to provide the services relating to the loan by mutual agreement with the new holder. All notifications must be sent to all holders and guarantors.

    As it forms part of the LCCI, Article 25 bis applies within the scope of its Article 2. This covers loans granted by professional lenders where the borrower, surety or guarantor is a natural person and the loan: (a) is secured by a mortgage or other right in rem over residential property, including storage rooms and garages; or (b) is intended for the acquisition or retention of land or property, but only where the borrower, surety or guarantor is a consumer. Loans to legal persons without natural-person guarantors would therefore be excluded.

    Q. Are there any credits that cannot be assigned?

    A. Yes. Overdue mortgage loans where the debtor has taken up the measures under Royal Decree-Law 6/2012 of 9 March on urgent measures to protect mortgage debtors without resources (RDL 6/2012) cannot be assigned.

    Q. What is the repurchase obligation?

    A. When an overdue loan secured by a mortgage on the debtor's principal residence is assigned, the assignor and/or assignee must inform the debtor that it may apply for the measures under RDL 6/2012.

    The phrase "the assignor and/or the assignee" in Article 25 bis.5 of the LCCI means that either or both of them may give the notice, so it is enough for one of them to send it.

    If the debtor proves that they meet the requirements within six months of being notified, the assignor must repurchase the loan at the assignment price and offer the requested measures. This obligation does not apply if it has been agreed with the assignor that the assignor will offer the measures.

    Article 25 bis.5 of the LCCI does not specify who enters into the agreement with the assignor, but we understand this to be the assignee, who agrees with the assignor that the latter will offer the measures without repurchasing the loan. As the provision does not specify who bears the financial cost of these measures, it is advisable to set this out in the assignment agreement.

    The repurchase obligation creates a contingency of up to six months from that notice, which will affect the valuation, the price, and the structure of the transactions (price holdbacks, adjustment mechanisms, representations and warranties).

    Q. To which transactions does this apply (Final Provision 11.2 of RDL 29/2026)?

    A. To assignments of mortgage loans carried out after RDL 29/2026 entered into force (8 October 2026), “regardless of when the agreement was entered into”.

    The second paragraph of Final Provision 11 does not clarify whether Article 25 bis of the LCCI applies to assignments of mortgage loans granted before the LCCI. It is arguable that it does not, because Article 25 bis only operates within the scope of the LCCI, which in principle is not retroactive. Nevertheless, there is a risk that the phrase "regardless of when the agreement was entered into" might be interpreted as including them.

    In addition, in our view, an assignment formalised by deed before 8 October 2026 falls outside the scope of the new regime, even if it is registered later. RDL 29/2026 itself adopts this approach in Article 1.3 for transfers formalised by deed and pending registration, and most legal commentators regard the registration of the assignment of the mortgage loan as merely declaratory. However, there is a risk of the opposite interpretation, precisely because Final Provision 11 does not include a carve-out like the one in Article 1.3.

    5.2 Amendment to the LHMPSD (Article 15 of RDL 29/2026 and Article 12 of the LHMPSD)

    Q. What is the new asset that may now be subject to a chattel mortgage?

    A. Article 15 of RDL 29/2026 amends Article 12 of the LHMPSD to include, within the exhaustive list of movable property eligible for a chattel mortgage, the “set of industrialised components intended for the industrialised construction of buildings, manufactured in a controlled environment for subsequent transport, delivery, assembly and fitting on site”.

    6. Other measures affecting the housing market: (i) amendments to the Housing Law and (ii) advertising of leases

    Article 4 of RDL 29/2026 amends the Housing Law's definition of a large holder and its transitional provisions. In addition, RDL 29/2026 strengthens the rules on the advertising of leases (Article 20).

    6.1 Amendments to the Housing Law

    Q. What are the changes to the definition of a large holder (Article 3.k of the Housing Law)?

    A. The thresholds remain unchanged: more than ten urban properties for residential use or more than 1,500 m² of floor area for residential use, excluding garages and storage rooms. In stressed residential market areas, the autonomous community may lower the threshold to owners of five or more properties in a reasoned decision.

    The changes are as follows:

    (a) Most significantly, where a registered property comprises a building with several units suitable for residential use, each of these units counts as a separate property, even if the building has not been divided into horizontal property.

    The regulation does not define "unit suitable for residential use". The most reasonable interpretation is that only units that are physically and functionally configured as independent residential units, with their own access and fit for occupation, count, and not those parts of the building that could merely be used as residential units. However, the point remains open and a broader interpretation cannot be ruled out.

    (b) For the reduced threshold for stressed residential market areas, the definition omits the word "urban".

    Read literally, this would also bring in non-urban residential properties located in the stressed residential market area. This has practical implications, as many declarations cover entire municipal areas, which may include residential units on rural land, while others expressly exclude rural areas. We recommend reviewing the boundaries of each area.

    (c) A Land Registry certificate listing the owner's properties must evidence large-holder status.

    The definition itself now contains this requirement, so it no longer applies only in procedural matters, as it did before.

    Q. What changes does RDL 29/2026 make to the transitional provisions of the Housing Law (Transitional Provision 4)?

    A. The original wording provided that lease agreements signed before the Housing Law entered into force would continue to be governed by the regime applicable to them. It therefore fully respected existing leases.

    The new wording changes this approach in two respects, but otherwise keeps the regime in force when the agreements were entered into:

    (d) Extensions: Agreements entered into before May 2023 may be extended under Article 10 of the LAU, as amended by the Housing Law. The most significant practical effect is that tenants under these agreements may apply for the two extraordinary extensions introduced by the Housing Law: the one-year extension on grounds of social and economic vulnerability, and the extension of up to three years in stressed residential market areas.

    (e) Rent reviews: The cap on rent reviews is now the IRAV (Article 18.1 of the LAU). In any event, until 31 December 2027, the extraordinary cap set out in Final Provision 6 of RDL 29/2026 also applies: if the rent exceeds the reference price index, the rent cannot be increased; in all other cases, in the absence of a new agreement, the increase may not exceed 2 per cent.

    In our view, none of these changes applies to lease agreements entered into before 1 January 1995, which are governed by their own transitional provisions, as Transitional Provision 4 of the Housing Law refers only to agreements "subject to Law 29/1994".

    6.2 Changes to the rules on the advertising of residential leases

    Q. What must the advertising of a residential lease now include (Article 20 of RDL 29/2026)?

    A. The advertising, promotion or offering of residential leases must comply with the principles of truthfulness and transparency, and must not omit or distort relevant information that could be misleading. Furthermore, it must include, at a minimum:

    (a) the reference index for residential rent, if the residential unit is located in a stressed residential market area;

    (b) in areas where the law caps the rent of principal residences, the applicable cap and references to the rules and parameters that determine that cap;

    (c) the number, code or other identifier of the residential unit (where applicable); and

    (d) the landlord’s status as a large holder (where applicable).

    Similar provisions were already in place in some autonomous communities (such as Catalonia and Navarre), but RDL 29/2026 extends them to the whole of Spain.

    7. Relevant tax measures

    7.1 SOCIMIs – increased special tax of 25 per cent

    With effect from tax periods commencing on or after 1 January 2026 and not having concluded by 8 October 2026 (the date of entry into force of this Royal Decree-Law), an increased special tax of 25 per cent is imposed on undistributed profits arising from residential lettings (including tourist accommodation or short-term lets).

    A reduction is provided for: (i) of 50 per cent if more than 80 per cent of the rental housing stock is allocated to affordable rental accommodation; and (ii) of 100 per cent if, in addition, the undistributed profit is reinvested within three years in affordable rental accommodation. For these purposes, "affordable rental housing" is defined as affordable housing and social housing (social or price-capped) in accordance with Article 3 of Law 12/2023 of 24 May on the Right to Housing. Furthermore, for the purposes of calculating the 80 per cent figure, the consolidated balance sheet shall be taken into account where the SOCIMI is the parent company of a group, considering only the stock of rental housing situated in Spain. Such a group shall consist exclusively of SOCIMIs and the other entities referred to in Article 2(1) of Law 11/2009 of 26 October, regulating SOCIMIs (for example, REITs not resident in Spanish territory or Collective Real Estate Investment Institutions).

    A transitional regime is established with thresholds of 60 per cent (2026) and 70 per cent (2027) of the rental housing stock intended for affordable rental. From 2028 onwards, the 80 per cent threshold will apply.

    7.2 VAT – tourist accommodation at the reduced rate (10 per cent)

    With effect from 1 December 2026, lettings of furnished flats or houses where the lease period for a single tenant does not exceed 30 nights will no longer be exempt from VAT and will instead be taxed at the reduced rate of 10 per cent. This will allow landlords affected by this measure to deduct the VAT which, where applicable, they may have incurred on the purchase of the property in question (10 per cent), as well as on the purchase of furniture (21 per cent) and on services received (for example, administrative services (21 per cent) or renovation or repair works (10 per cent)). The financial impact of this measure on the landlord could even be favourable due to the difference in rates between output VAT and input VAT.

    7.3 VAT – social housing at the super-reduced rate (4 per cent)

    With effect from 1 December 2026, the transfer of social housing with permanent or indefinite status will be taxed at the super-reduced rate of 4 per cent, as is currently the case for housing classified as special-status social housing or publicly-funded housing.

    7.4 IBI – surcharges for vacant and holiday homes

    With effect from tax periods commencing on or after 8 October 2026 (the date of entry into force of this Royal Decree-Law) and for an indefinite period, local councils are authorised to impose surcharges of between 50 per cent and 150 per cent of the IBI liability on unoccupied properties or those used for tourist purposes in stressed residential market areas, with progressive scales based on the number of properties owned by the owner and the number of years the property has been unoccupied. These surcharges will accrue on 31 December and will be settled annually by local councils. It is noteworthy that 1 January has not been set as the accrual date for these surcharges, as is the case with the IBI levy itself, which will result in duplication in the administration of this tax.

    Conclusion

    RDL 29/2026 radically transforms the legal framework governing housing in Spain.

    • Purchasing power: Until 31 December 2030, certain entities cannot acquire residential units for less than 70 per cent of their market value. Until the Code of Good Practice is approved, this restriction also applies to awards in enforcement proceedings.
    • Vulnerable tenants: RDL strengthens their protection through suspension measures until 2030 and a permanent obligation on the public authorities to cure arrears.
    • New lease extensions: RDL 26/2029 introduces an extraordinary extension of up to two years. In addition, applications made under RDL 8/2026 remain, and the extensions under the Housing Law now apply to leases entered into before 26 May 2023.
    • Contractual framework: RDL 29/2026 reorganises the rules on temporary residential leases, room leases, and leases of large or high-rent residential units. Landlords can pass fewer costs on to tenants (in particular, IBI and community expenses in buildings that have not been divided into horizontal property), and the right of pre-emption is strengthened. This right can no longer be waived in the lease agreement and applies to joint sales of legally identifiable individual residential units.
    • NPL portfolios: The new Article 25 bis of the LCCI imposes a repurchase obligation on the assignment of overdue loans secured by a mortgage on the debtor's principal residence, provided they fall within the scope of the LCCI. This clause must be reflected in the price and in the transaction documentation.

    The regulation has been in force since 8 October 2026 and many of its provisions also apply to existing leases and pending proceedings.

    Ashurst Perkins Coie Spain has a leading multidisciplinary team specialising in advising all types of investors in the Spanish residential market and on the acquisition and sale of loan portfolios and REOs. We can help you analyse your assets and the impact the new framework may have on them, and define strategies that maximise certainty and returns within a legislative framework that is still evolving.

    The information provided is not intended to be a comprehensive review of all developments in the law and practice, or to cover all aspects of those referred to.
    Readers should take legal advice before applying it to specific issues or transactions.